Friday, March 9, 2012

February 14, 2012

Another piece of PVC was installed around the PVC, and new gaskets were made so that the original PVC piece is more centered around the bolts. This should more evenly distribute the torque around the assembly and make a better seal and end with cleaner construction. The gaskets also have 2 seals on the inside and on the outside edge of the PVC which ensures a waterproof seal more than a single seal around an edge. The construction of the camera is nearing the end.