Friday, March 9, 2012

March 5, 2012

Wires on the side of the ROV Unit were cleaned up. The leads were added with flux, tinned, and then soldered together. Then heatshrink tubing was used to insulate the wires to ensure there were no shorts conducted underwater. These wires were then zip-tied down to the assembly and mounted toward the back for when we reinstall the underwater electronics unit. Everybody is preparing for the test coming up quickly on March 7, 2012.

No comments:

Post a Comment